Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/16/d464810934/htdocs/LE/wp-content/plugins/gravityforms/common.php on line 1276

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/16/d464810934/htdocs/LE/wp-content/plugins/gravityforms/common.php on line 1313

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/16/d464810934/htdocs/LE/wp-content/plugins/gravityforms/common.php on line 1317

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/16/d464810934/htdocs/LE/wp-content/plugins/gravityforms/common.php on line 1345

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/16/d464810934/htdocs/LE/wp-content/plugins/gravityforms/common.php on line 3538

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/16/d464810934/htdocs/LE/wp-content/plugins/gravityforms/common.php on line 3545

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/16/d464810934/htdocs/LE/wp-content/plugins/gravityforms/common.php on line 3558
Fox Farms Storage Units - Morton, Illinois | Land Engineers LLC

Fox Farms Storage Units – Morton, Illinois

Land Engineers LLC provided land development services, including a site plan and Storm Water Pollution Prevention Plan (SWPPP) for storage units in Morton, IL.This five acre site is being developed in three phases. Mr. James Smallenberger of Morton Illinois first contacted Land Engineers LLC in June 2009 to provide land development services for construction of two self-storage buildings on this site just outside Morton, Illinois.

Land Engineers LLC surveyed the site and developed a site plan to meet the requirements of Tazewell County Planning and Zoning. Site improvements included concrete drives around the storage buildings and a storm water detention basin with an outlet control structure. Because this site disturbed more than one acre of land, a Storm Water Pollution Prevention Plan (SWPPP) was developed for the site and submitted to Illinois Environmental Protection Agency for an NPDES Permit. Construction on this first phase was completed in 2010.

In 2012, Mr. Smallenberger contacted Land Engineers LLC again to prepare the site plan for two additional buildings at this site. At this time this five acre parcel of land was subdivided from the larger farm property. In December 2012, construction on the second phase was completed.

Land Engineers LLC is working on the site plan for the fifth and sixth storage units that are expected to be complete in 2014.

Services provided:

  • Site development plan
  • Site grading plan and storm water detention design
  • Boundary and topographic surveys
  • Subdivided property from larger tract
  • Storm Water Pollution Prevention Plan (SWPPP)
  • Permit assistance
  • Construction layout and staking

Contact Land Engineers
  • Please enter the following information and click "submit". We will review your submission and respond as soon as possible.
  • This field is for validation purposes and should be left unchanged.
×